http://english.e23.cn 2019-06-05 17:18:33
As the pilot operation of No.1 rail transit line was undertaken and No. 3 line opens to the public on October 1st , the accurate information of the high-profile No.2 line comes—No. 2 line which be the provincial’s first subway built according to the automatic standards will be under full-scale construction after the approval of Shandong Development and Reform Commission.
No.2 line, total length of 36.4 km (34.8 km underground line and 1.6 km overhead line) is designed into 19 stations (18 underground stations and 1 overhead station ), including 10 transfer stations (2 transfer stations of 3 lines)with the average distance between stations of about 1.98 km.