Jinxiuchuan Interchange Grand Bridge, Ji’nan Section of Ji’nan-Tai’an Highway Half Completed.

http://english.e23.cn 2019-09-03 13:50:53

  A girder was placed firmly on the pier of Jinxiuchuan interchange grand bridge construction site as the command of the commander on September 2nd . 60% of Jinxiuchuan interchange grand bridge, the controlling node engineering which is 1788.4 meters long has been completed .

\