http://english.e23.cn 2022-07-12 16:33:39
The turning bridge crossing Xinyan Railway, the important control engineering between Ji’nan-Weishan Highway and Ji’ning new airport to Zaozhuang-Heze High Speed had a smooth turning at 2:36 a.m, July 11th , taking a solid step to the transport service of the south section of Ji’nan-Weishan Highway by the end of this year.