http://english.e23.cn 2023-09-04 19:42:47
On September 2, at the construction site of Jinan Yellow River Highway Bridge expansion project of G104 Jinglan Line, the steel girder of the new bridge across the Yellow River was set up to the middle line of the Yellow River, and the construction bridge between the north and south ends of the main bridge has been set up, and the bridge is only "one step away" to be connected.