http://english.e23.cn 2023-09-06 15:27:28
After the construction of the tower crown curtain wall of Ping’an Financial Center in Ji’nan CBD was completed, the exterior wall at the“zipper ”position where it was the original construction elevator is under busy construction.Besides, the installation of the tower glass curtain wall with a total area of about 80,000㎡ meets the end.