Approach Bridges on Both Sides of Xiaoqing River Take Shape

http://english.e23.cn 2024-01-29 17:06:40

Approach Bridges on Both Sides of Xiaoqing River Take Shape

  At the construction site of the north extension of Lashan River Road (East) project, the first approach bridge at the south bank of Xiaoqing River has been poured and formed. It is expected that the main bridge across the railway will be kicked off.