Over-river Bridge Under Shunhe Viaduct Demolished and Rebuilt

http://english.e23.cn 2024-04-10 14:13:32

Over-river Bridge Under Shunhe Viaduct Demolished and Rebuilt

  Xixuzihao Bridge, which had been in operation for seven years, was demolished on April 9th . The on-site construction notice shows that the bridge failed to meet the once-in-20-year flood control standard and needs to be demolished and rebuilt.