http://english.e23.cn 2024-05-08 16:20:24
On May 7th, at the construction site of the Jinan Zero Point Interchange renovation project, after the completion of the connection of the east-west ramps on both the north and south sides of the overpass, the traffic markings on the bridge surface have been applied, and the main steel structure of the newly constructed toll station has been formed.