Advancing in Order: Track Laying of Rail Transit Line 8

http://english.e23.cn 2024-05-11 15:37:27

Advancing in Order: Track Laying of Rail Transit Line 8

  On May 10th, the track-laying work on Rail Transit Line 8 was progressing smoothly and orderly on the east of Anlifang Road. Currently, the track-laying for Line 8 is using the "scattered laying method", with four track-laying points set up in the elevated section for construction. The first section of the track framework from Anlifang Road Station to Panwang Road Station (both are engineering names) was completed.